Hull 44 Construction 9/19/23 - The boat is in the workshop.
-
Hull 44 Construction The state of the hull.
-
Hull 44 Construction 9/20/23 - The hull is sanded and ready for fiberglass.
-
Hull 44 Construction The fiberglass is saturated with epoxy.
-
Hull 44 Construction 9/21/23 - The fiberglass is given a fill coat of epoxy.
-
Hull 44 Construction 9/25/23 - The deck is half sanded.
-
Hull 44 Construction Hole for carrying handle is created.
-
Hull 44 Construction The entire deck is sanded and filled.
-
Hull 44 Construction 9/26/23 - Bulkheads and hatch lips are fiberglased on one side.
-
Hull 44 Construction 10/2/23 - The deck is ready for epoxy.
-
Hull 44 Construction The fiberglass is epoxy saturated.
-
Hull 44 Construction Cockpit coaming lips and hatch lips are fiberglassed.
-
Hull 44 Construction Flip sides of bulkheads are glassed.
-
Hull 44 Construction 10/4/23 - Hatches are marked out.
-
Hull 44 Construction Hatches are cut out of the deck.
-
Hull 44 Construction The inside of the port side deck to hull joint is filletted and fiberglassed.
-
Hull 44 Construction Hatch lips are epoxied together.
-
Hull 44 Construction 10/5/23 - Starboard site joint is epoxied.
-
Hull 44 Construction 10/8/23 - End pours are applied.
-
Hull 44 Construction 10/9/23 - Forward bulkhead is epoxied in place.
-
Hull 44 Construction Aft bulkhead is epoxied in place.
-
Hull 44 Construction Aft hatch lips are epoxied in place.
-
Hull 44 Construction Forward hatch lips are epoxied in place.
-
Hull 44 Construction 10/10/23 - The cockpit coaming riser is epoxied in place.
-
Hull 44 Construction The coaming lip is epoxied in place.
-
Hull 44 Construction 10/11/23 - The coaming is ready for fiberglass.
-
Hull 44 Construction 10/12/23 - The glass is saturated with epoxy.
-
Hull 44 Construction 10/13/23 - The coaming is given a fill coat of epoxy.
-
Hull 44 Construction 10/16/23 - Blocks for Rudder cables are epoxied in place.
-
Hull 44 Construction 10/21/23 - Hatch hold down dowls are epoxied in place.
-
Hull 44 Construction 10/24/23 - Half of the hull is sanded in preparation for varnish.
-
Hull 44 Construction 10/28/23 - First coat of varnish.
-
Hull 44 Construction 10/28/23 - Another varnish coat.
-
Hull 44 Construction 10/30/23 - The deck is ready for varnish.
-
Hull 44 Construction First coat of varnish.
-
Hull 44 Construction 11/02/23 - The upgraded seat is installed.
-
Hull 44 Construction Soft padeyes are installed.
-
Hull 44 Construction Deck rigging and perimeter lines are installed.
-
Hull 44 Construction Rudder is installed.